| 1 | MANAGER | 10 - 15 | B.E. OR B. TECH IN ELECTRICAL ENGINEERING | | 3 | |
| 2 | ASST. MANAGER (GUIDING THE TEAM OF ENGINEERS FOR PREPARING GA/ SCHEMATICS, BOQs, CUSTOMER SUBMITTALS | 08-10 | B.E./ B. TECH (EEE) ENGINEER | | 3 | |
| 3 | ENGINEER(MV SWITCHGEAR/GIS/RMU) | 05-08 | B.E. MECHANICAL/ELECTRICAL ENGINEER | | 2 | |
| 4 | ENGINEER(MV SWITCHGEAR/AIS/CIRCUIT BREAKERS) | 05-08 | B.E. MECHANICAL/ELECTRICAL ENGINEER | | 2 | |
| 5 | ENGINEER(PREPARATION OF GA/SCHEMATICS,BOQs OF MV METAL ENCLOSED SWITCHGEAR) | 05-08 | B.E./ B. TECH (EEE) ENGINEER | | 4 | |
| 6 | SCADA ENGINEER | 05-08 | B.E./ B. TECH (EEE/ECE/CS) (SCADA ENGINEER) | | 2 | |
| 7 | ELECTRICAL DRAUGHTSMAN | 04-05 | DIPLOMA IN (ELECTRICAL) | | 6 | |
| 8 | ELECTRICAL DRAUGHTSMAN | 04-05 | DIPLOMA IN (ELECTRICAL) | | 6 | |
| 9 | MECHANICAL DRAUGHTSMAN | 04-05 | DIPLOMA INMECHANICAL | | 6 | |
| 10 | ENGINEERING PLANNER | 08-10 | Electrical Engineering | | 2 | |
| 11 | ASSISTANT PRODUCTION MANAGER | 07 | BE in Electrical Engineering. | | 2 | |
| 12 | PRODUCTION ENGINEER-GIS Switchgear Assembly | 4-5 | B.E. (Electrical). | | 2 | |
| 13 | MATERIALS ENGINEER (JUNIOR LEVEL)( | 2-3 | B.E. (Electrical/Mechanical). | | 4 | |
| 14 | MATERIALS ENGINEER (SENIOR LEVEL) | 07-10 | B.E. (Electrical/Mechanical) | | 4 | |
| 15 | MATERIALS ENGINEER (SENIOR LEVEL- Site/Project Experience | 07-10 | B.E. (Electrical/Mechanical). | | 4 | |
| 16 | ENGINEER-PROJECT ENGINEERING | 15 | : B.E.(Electrical & Electronics) | | 7 | |
| 17 | SANDBLASTER CUM HYDRO BLASTER | 4-5 | SSC | | 15 | |
| 18 | SPRAY PAINTERS | 4-5 | SSC | | 10 | |
| 19 | MARINE MECHANIC (SHIP) | 4-5 | SSC | | 5 | |
| 20 | AUTO DIESEL MECHANIC | 6 Yrs | | NEGOTIABLE | 20 | |